在线询价
PRODUCT
产品展示
产品展示
首页 / - 产品展示
前处理粉体涂装线 -The Pretreatment Powder Coating Line 价格:

在线询价
详细内容/广泛应用

前处理粉体涂装线



前处理粉体涂装线是一种以 “前处理工序” 为核心前置环节、配套粉体喷涂工艺的工业化涂装生产线,主要应用于金属工件(如碳钢、铝合金、镀锌板等材质的钣金件、结构件)表面处理与涂装,核心目标是通过精细化前处理去除工件表面杂质、优化基材表面状态,为后续粉体涂层提供强附着力基础,最终实现工件防腐、耐磨、美观的综合性能。该生产线整体由前处理核心单元、粉体喷涂单元、固化单元、冷却单元及后处理检测单元构成,其中前处理单元的工艺完整性与精度直接决定最终涂装质量。

前处理核心单元针对不同金属基材特性设计差异化流程:对于碳钢工件,通常采用 “预脱脂→主脱脂→水洗→酸洗除锈→水洗→中和→水洗→磷化→水洗→钝化→烘干” 全流程,通过脱脂(采用碱性脱脂剂,温度 40-60℃,时间 5-10 分钟)去除轧制油、切削液等油污,酸洗(盐酸或硫酸溶液,浓度 8%-15%)清除氧化皮与锈蚀,磷化(锌系或锰系磷化液,形成 5-10μm 磷化膜)提升基材与涂层的结合力;对于铝合金工件,因材质易氧化且不耐强酸,前处理流程简化为 “脱脂→水洗→碱蚀(弱碱性溶液,去除表面氧化膜)→水洗→中和→水洗→铬化 / 无铬钝化→烘干”,避免过度腐蚀;镀锌板工件则侧重 “脱脂→水洗→钝化→烘干”,通过钝化处理(铬酸盐或无铬钝化剂)增强表面抗蚀性。前处理后的工件需确保表面洁净度(油污残留≤5mg/m²)、磷化膜 / 钝化膜均匀无漏点,且烘干后含水率≤0.5%。

后续粉体喷涂单元采用静电喷涂工艺,粉末(如环氧树脂、聚酯粉末)在高压静电(60-100kV)作用下带负电,均匀吸附于接地的前处理后工件表面;固化单元通过热风循环烘箱(温度 160-200℃,时间 15-30 分钟)使粉末熔融固化成膜;冷却单元快速降温至室温后,后处理检测单元通过附着力测试(划格法≥4B)、盐雾测试(中性盐雾≥500 小时)等验证涂层质量。相比常规粉体涂装线,前处理粉体涂装线因强化了基材预处理环节,可使涂层附着力提升 30% 以上,耐腐蚀性显著增强,尤其适用于对涂装质量要求严苛的领域(如汽车底盘件、户外工程机械部件)。



The Pretreatment Powder Coating Line is an industrial coating production line that takes the "pretreatment process" as the core preliminary link and is matched with the powder spraying process. It is mainly used for surface treatment and coating of metal workpieces (such as sheet metal parts and structural parts made of carbon steel, aluminum alloy, galvanized sheet and other materials). Its core goal is to remove impurities on the workpiece surface and optimize the substrate surface state through refined pretreatment, providing a strong adhesion foundation for the subsequent powder coating, and finally achieving the comprehensive performance of corrosion resistance, wear resistance and aesthetics of the workpiece. The whole production line is composed of a core pretreatment unit, a powder spraying unit, a curing unit, a cooling unit and a post-treatment inspection unit. The process integrity and precision of the pretreatment unit directly determine the final coating quality.

The core pretreatment unit designs differentiated processes according to the characteristics of different metal substrates: For carbon steel workpieces, the full process of "pre-degreasing → main degreasing → water washing → pickling and derusting → water washing → neutralization → water washing → phosphating → water washing → passivation → drying" is usually adopted. Degreasing (using alkaline degreaser, temperature 40-60℃, time 5-10 minutes) removes oil stains such as rolling oil and cutting fluid; pickling (hydrochloric acid or sulfuric acid solution, concentration 8%-15%) removes oxide scale and rust; phosphating (zinc-based or manganese-based phosphating solution, forming a 5-10μm phosphating film) improves the bonding force between the substrate and the coating. For aluminum alloy workpieces, due to their easy oxidation and intolerance to strong acids, the pretreatment process is simplified to "degreasing → water washing → alkali etching (weak alkaline solution, removing surface oxide film) → water washing → neutralization → water washing → chromating / chromium-free passivation → drying" to avoid excessive corrosion. For galvanized sheet workpieces, the focus is on "degreasing → water washing → passivation → drying", and passivation treatment (chromate or chromium-free passivator) is used to enhance the surface corrosion resistance. After pretreatment, the workpiece must ensure surface cleanliness (oil residue ≤5mg/m²), uniform phosphating film/passivation film without missing points, and moisture content ≤0.5% after drying.

The subsequent powder spraying unit adopts the electrostatic spraying process. The powder (such as epoxy resin, polyester powder) is negatively charged under the action of high-voltage static electricity (60-100kV) and evenly adsorbed on the surface of the grounded workpiece after pretreatment. The curing unit melts and cures the powder into a film through a hot air circulation oven (temperature 160-200℃, time 15-30 minutes). After the cooling unit quickly cools down to room temperature, the post-treatment inspection unit verifies the coating quality through adhesion test (cross-cut method ≥4B), salt spray test (neutral salt spray ≥500 hours) and other tests. Compared with the conventional powder coating line, the pretreatment powder coating line strengthens the substrate pretreatment link, which can increase the coating adhesion by more than 30% and significantly enhance the corrosion resistance. It is especially suitable for fields with strict requirements on coating quality (such as automobile chassis parts, outdoor engineering machinery parts).